PINNeAPPle Request a quote

Heat exchangers and thermal

The fouled exchanger before it becomes a plant shutdown.

A thermal study for exchangers, heat sinks and panels: temperature at the critical point, margin to the limit and how long fouling takes to push the process out of band — with the uncertainty stated.

Studies run 4 to 10 weeks, depending on the scope. The quote is closed from the geometry, the fluid and the question — before any of the work.

Exchangers, heat sinks and panelsMeasured and stated errorDelivered in 4 to 10 weeks
Digital twin of an asset in 3D with a live reading panel
Twin in operation0.216 °C of error · alarm 2.6 h ahead

Where it hurts

The problem as it arrives here

Three pains that bring a thermal study here — and what the number changes in the decision.

The margin nobody can size

The design was built with slack. Nobody knows how much of it the fouling has already eaten.

The temperature that only shows up at shutdown

By the time the reading leaves the band, the cleaning window has passed and the decision is an emergency.

The bench that costs more than the decision

Building a thermal test for every geometry is expensive and late, arriving after the design is closed.

In and out

What we need and what you get

Without these the study does not start; with them, the number comes with its validity range stated.

In

  • Exchanger, heat sink or panel geometry (CAD, STEP or a dimensioned drawing)
  • Fluids, flow rates and inlet temperatures on both sides
  • Material properties and interface conductivity
  • For the twin: operating history (temperatures, flow rates, cleanings)
  • Operating limit: maximum temperature and the margin the plant requires

Out

  • Temperature field and the temperature at the critical point
  • Margin to the operating limit, with its uncertainty band
  • Overall coefficient and estimated fouling (in the twin)
  • Estimated time to leave the band, with the alarm lead time
  • Report with the verification and the limits section

The proof

The number, with the reference up front

The asset in 3D with the live reading beside it — the shape of the twin that follows the exchanger in operation.

0.216 °Cof error against a redundant probe · twin in operation, separate window
95.5%band coverage · calibrated outside training
2.6 hof alarm lead time · with the forecast error stated
4.46%mean error of the thermal surrogate · 7.35% worst case, inside the trained range
Digital twin of an asset in 3D with a live reading panel
The asset in 3D with the live reading beside it — the shape of the twin that follows the exchanger in operation.

More proof

A heat sink that answers 200,000 times faster

Seven geometries, one 3D solver and a surrogate at 4.46% mean error (7.35% worst case), inside the trained range.

Read the full study →

The right field, the physics rejected

An FNO at 1.7% error against finite volumes and a PDE residual of 0.164 against the 0.1 limit: the trust card said no, and the article shows why.

Read the full study →

Read the full study → Example report (PDF) ↗ Example reports →

Deadline and price

Scope, deadline and quote before any of the work

Studies run 4 to 10 weeks, depending on the scope. The quote is closed from the geometry, the fluid and the question — before any of the work.

Discovery and scope

We clarify the challenge, available data, constraints, and success metrics.

Development and integration

We combine simulation, AI, and engineering tools in a reproducible pipeline.

Validation and delivery

We document evidence, uncertainty, limits of use, and project results.

Custom scope: Scope, timeline, and budget are defined for each project. Experimental testing, legal certification, and full mechanical design are not automatically included.

Explore the platform Example report (PDF) ↗

Other segments

The same rigour, another phenomenon

Erosion in piping →Valves and machinery →

Let's build your solution

Your engineering challenge could be our next project.

Talk to our team about Physics AI consulting or explore PINNeAPPle Studio for modeling and verification workflows.

Talk to an engineer